Beam Combining Facility
Snow covered Interferomter site
The Interferometer site before the start of construction
Computer rendering of the BCF and the UTs in close pack configuration
The arms of the Interferomter become visible after initial excavations begin
Beam Combining Facility during its construction
Beam Combining Facility during its construction
Beam Combining Facility during its construction
Beam Combining Facility Delay Line section
Beam Combining Facility Delay Line section
Beam Combining Facility from an apache helicopter
Winter at the Beam Combining Facility
Spring at the Beam Combining Facility
Dedicated tree from the dedication ceremony
The Beam Combining Facility building today
Mechanical lab in the Beam Combining Facility
Optics lab in the Beam Combining Facility
Optics lab in the Beam Combining Facility
Delay Line line (with the 1st 100 meter pipe installed) in the Beam Combining Facility
Delay Line line (with the 1st 100meter pipe installed) in the Beam Combining Facility
Delay Line line (with the 1st 100meter pipe installed) in the Beam Combining Facility
Delay Line line (with the 1st 100meter pipe installed) in the Beam Combining Facility
Delay Line line (with the 1st 100meter pipe installed) in the Beam Combining Facility
Inner Beam Combining Area in the Delay Line line (with the 1st 100meter pipe installed) in the Beam Combining Facility
Metrology system in the inner Beam Combining Area in the Delay Line line (with the 1st 100meter pipe installed) in the Beam Combining Facility
Metrology system in the inner Beam Combining Area in the Delay Line line (with the 1st 100meter pipe installed) in the Beam Combining Facility