Home » Gallery » Interferometer » Instrumentation » Iconn (Fringe Tracker) & the Closed Loop Fringe Experiment
2012-06-26 08.33.19
The dewar waiting to be enclosed
2012-06-26 08.33.39
2012-06-26 08.46.31
2012-06-26 08.46.48
All side panels installed
2012-06-26 09.00.27 HDR
2012-06-26 11.10.44 HDR
2012-06-26 13.45.42 HDR
2012-06-26 13.46.00 HDR
2012-06-26 13.46.52 HDR
Plywood panels were installed to support the vacuum pump above the table.
2012-06-26 13.47.16
2012-06-26 15.41.31 HDR
The completed enclosure
2012-06-26 15.44.02
The completed enclosure from the inside....Next step realigning the beam combiner and the Magic Optical Box of the AAS.