Home » Gallery » Interferometer » Beam Combining Facility
Plaque 004
Dedicated tree from the dedication ceremony
ArrayImage_small
The Beam Combining Facility building today
_JG_8981
Mechanical lab in the Beam Combining Facility
_JG_8987
Optics lab in the Beam Combining Facility
_JG_8988
Optics lab in the Beam Combining Facility
_JG_8998
Delay Line line (with the 1st 100 meter pipe installed) in the Beam Combining Facility
_JG_8999
Delay Line line (with the 1st 100meter pipe installed) in the Beam Combining Facility
_JG_9001
Delay Line line (with the 1st 100meter pipe installed) in the Beam Combining Facility
_JG_9002
Delay Line line (with the 1st 100meter pipe installed) in the Beam Combining Facility
_JG_9012
Delay Line line (with the 1st 100meter pipe installed) in the Beam Combining Facility
_JG_9023
Inner Beam Combining Area in the Delay Line line (with the 1st 100meter pipe installed) in the Beam Combining Facility
_JG_9024
Metrology system in the inner Beam Combining Area in the Delay Line line (with the 1st 100meter pipe installed) in the Beam Combining Facility