Home » Gallery » Interferometer » Beam Combining Facility
MRO_hi
Snow covered Interferomter site
mroisite1
The Interferometer site before the start of construction
MROI UTE Close Pack aerial view
Computer rendering of the BCF and the UTs in close pack configuration
20070307_aerial_bcf
The arms of the Interferomter become visible after initial excavations begin
IMG_0364
Beam Combining Facility during its construction
2007-10-29-MROI 015
Beam Combining Facility during its construction
2007-10-29-MROI 018
Beam Combining Facility during its construction
rs 020
Beam Combining Facility Delay Line section
rs 022
Beam Combining Facility Delay Line section
BCF_cropped_2008_05_30
Beam Combining Facility from an apache helicopter
IMG_2976
Winter at the Beam Combining Facility
IMG_0608
Spring at the Beam Combining Facility